Livorno Ferraris power plant was commissioned and started operations in 2008. It is located in the province of Vercelli (Piemonte region). It is a CCGT with a net installed capacity of 805 MW, consisting of two gas turbines and one steam turbine. In order to limit the impact of the plant on the frail surrounding ecosystem, severe environmental requirements had been adopted with relevant air, water and noise monitoring campaigns, in order to assess the compliance of the power stations with the limits sets by law, since the design and the construction phases.